That makes sense, thank you! Is there a recommended procedure/documentation in how to go about upgrading to Java 11 so as not to accidentally break Graylog?
I found this post (Upgrading from openjdk 8 to 11) about someone that went from version 1.8 to 11 and they mentioned an issue with changing garbage collection settings. Is this the main consideration needed or would other areas need to be changed to ensure a smooth transition?